MCCB paying AT&T Costs.
MISSISSIPPI PUBLIC COMMUNITY AND JUNIOR COLLEGS FY 2018 Estimated EDUCATION TECHNOLOGY COSTS
ALL Colleges utilizing AT&T services, except MGCCC
Total $7,099,160 General Fund S.B. 2964
10 GB
C-Spire Ethernet Circuits
ITS
New AT&T Circuits for Redundancy ASE & 2-1GB Ethernet
LMS Canvas*
OTHER RECURRING
INDIVIDUAL
**Estimated**
TECHNOLOGY Wimba/Respondus
REMAINING
TOTAL CJC GF ED.TECHNOLOGY
DATA AND VIDEO DATA AND VIDEO
Internet/
POSITIONS
REMAINING 1/2 BASED ON
JULY
JANUARY
TOTAL
Full time
LINE CHARGES
LINE CHARGES
Related Technology & MSVCC Expenses
& CSpire Internet
DISTRICT COAHOMA
10 GB
10 GB
Backbone COSTS
1/2 EVENLY ENROLLMENT
COSTS FY 2018
DISBURSEMENT DISBURSEMENT DISBURSEMENTS Equivalent FTE
11,988.00 11,988.00 11,988.00 11,988.00 11,988.00 11,988.00 11,988.00 11,988.00 11,988.00 11,988.00 11,988.00 11,988.00 11,988.00 11,988.00 11,988.00 323,757.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
58,908.00 58,908.00 58,908.00 58,908.00 58,920.00 58,920.00 58,920.00 58,908.00 58,908.00 58,908.00 58,920.00 58,908.00 58,920.00 58,908.00 58,908.00
100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000
41,450.00 41,450.00 41,450.00 41,450.00 41,449.00 41,450.00 41,449.00 41,450.00 41,450.00 41,450.00 41,449.00 41,450.00 41,449.00 41,450.00 41,450.00
16,889.00 26,349.00 22,078.00 36,117.00 97,207.00 51,408.00 47,764.00 45,466.00 28,886.00 21,872.00 79,354.00 29,708.00 63,387.00 38,349.00 16,912.00
217,247.00 226,707.00 222,436.00 236,475.00 297,576.00 251,778.00 248,133.00 245,824.00 229,244.00 222,230.00 291,711.00 230,066.00 263,756.00 238,707.00 217,270.00 3,460,000.00 7,099,160.00 7,099,160.00 0.00
108,293.00 113,374.00 111,504.00 118,403.00 149,351.00 125,454.00 124,375.00 123,009.00 114,492.00 111,107.00 146,010.00 114,957.00 131,611.00 118,980.00 108,660.00
108,954.00 113,333.00 110,932.00 118,072.00 148,225.00 126,324.00 123,758.00 122,815.00 114,752.00 111,123.00 145,701.00 115,109.00 132,145.00 119,727.00 108,610.00 1,730,000.00 3,549,580.00 3,549,580.00
217,247.00 226,707.00 222,436.00 236,475.00 297,576.00 251,778.00 248,133.00 245,824.00 229,244.00 222,230.00 291,711.00 230,066.00 263,756.00 238,707.00 217,270.00 3,460,000.00 7,099,160.00 7,099,160.00 0.0000000
1,557.5 2,429.9 2,036.0 3,330.7 8,964.3 4,740.9 4,404.7 4,192.8 2,663.8 2,017.0 7,317.9 2,739.7 5,845.4 3,536.5 1,559.6
COPIAH-LINCOLN EAST CENTRAL EAST MISSISSIPPI
HINDS
HOLMES ITAWAMBA MERIDIAN MISS. DELTA JONES
MISS. GULF COAST NORTHEAST MISS NORTHWEST MISS
11,988.00
PEARL RIVER
SOUTHWEST MISS
MCCB
491,589.00
540,000
-
0.00
MCCB - Learning Mgt System
0.00
0.00
0
0
2,428,411
0.00
0.00
3460000 1,730,000.00
0
TOTAL
503,577.00
503,577.00
540,000.00
0.00
883,680.00
1,500,000.00
2,428,411.00 621,746.00 2,428,411 7,099,160.00
621,746.00
0 3,549,580.00
57,336.6
179820
$10.84
3,549,580.00
57337
463916 -39661
540,000
883,680
5,855,668.00
621,746.00 621,746.00
0.00
0.00
0.00
0.00
0
-
41,450 1,243,492.00
41,450.00
The estimates for line charges/circuits are based upon costs provided AT&T in December of 2015 for 15 colleges and the MCCB. The former AT&T prices included the enhanced features of Priority Plus Q-Forwarding and Metro Ethernet Reporting for 100 MB Fixed ME pricing per site. The cost for 100 MB metro ethernet AT&T connections to the college campuses varied from $970 per month to $1,631 per month for a total of $352,469. The new pricing estimates from AT&T are at the speed of 1 GB at the cost of $899.00 per month or $10,788 per college. The $323,752 calculation for the MCCB consists of $167,832 for the cost of 14 colleges' circuits at $899 + $100 per month or $11,998 per college per year. MGCCC will pay for their circuit directly. Two MCCB circuits (($16,439 +3005) X 12 = $269,328 and ($5,288 X 12 = $63,456), and 15% of community and junior college line charges ($179,820 x 15% = $26,973) for any additional charges.
ITS Backbone Costs - Speed 10,000,000,000 GB x $5.40 per MB = $540,000
621746
ITS/AT&T
Current 2 Gbps
Proposed 10 Gbps
5376 32463 37839 12 454062
41,449.73
Internet Access
$ $ $
8,000.00 3,000.00 11,000.00
$ $ $
40,000.00 5,000.00 45,000.00
35207
WAN Port
Total Backbone
12
$
540,000.00
Cspire Ethernet Connection = 1 GB Ethernet:
Each Monthly Monthly x 15 colleges
Increase
Annual Amount
5 Year MRC
$ $ $ $ $ $ $ $ $ $ $
2,350.00 157.00 267.00 2,774.00
$ $ $ $ $ $ $
35,250.00 2,350.00 4,000.00 41,600.00 5,818.05 4,000.05 9,818.10
Venture Data Center (2) 10 GB Ports MCCB 2 -1GB (<5ms) Cspire
$
499,200.00
2 Gig DIA
387.87 266.67 654.54
Rate Increase 1GB Ethernet (2) Total Monthly Rate Increase Proposed Upgrade to CSPIRE: 5 Year MRC
$
117,817.20
$
617,017.20
3,428.54
3,428.54 1,481.73 4,910.27
$ $ $
51,428.10 22,225.95 73,654.05
Proposed 10 Gig DIA
Total Proposed
$
266,662.80 22,221.90
$
883,680.00
$ The colleges will need hardware (switches and Firewall) in the total amount of $506,706.08.
At the September meeting of the Mississippi Community Connectivity Consortium (MC4), there was a proposal made to upgrade the MC4 Network, which provides Internet for the community colleges. This proposal was made because of the increase in Internet bandwidth utilization at all of the colleges. On October 27, 2015, the proposed network upgrade was approved by the MACJC. The proposal included: Cspire Side - (1) Upgrade the 2 GBps Cspire Dedicated Internet Access (DIA) to a 10 Gig DIA and (2) Upgrade the two 1 Gig Cspire circuits between the Venture Data Center and MCCB to 4 GBps. The total cost per year is $883,680.00 for the cost of 15 colleges at $4,910.27 per month or $73,654.05 per college per year. AT&T Side - (1) Upgrade the shared MetroE circuits to a full 1 Gig ASE circuit for each college and (2) Upgrade the 2 Gig DIA to a 10 Gig DIA.
FY 2018
* MCCB Education Technology Budgeted Expenses:
Major Objects
Technology
MSVCC
TOTAL
354,314
100,000 1,565,115 200,000
454,314 1,565,115 200,000 540,000 503,577 196,994
TechnologyPositions
0 0
Contractual Services - Learning Management System
- Wimba & Respondus 3.5
540,000 503,577 196,994
- Internet Access (3GB to 4GB)
-Data &VideoLine Charges (double capacity from 50 MB to 100 MB)
Other MCCBEd. Tech Expenses
0 0
0 0
RedundancyProject
Circuit/Switches Upgrades/Other Total Education Technology Needs
3460000 ADMIN BILL
1,594,885
1,865,115
3,460,000